Location: Germany
Date: July, 2020 – Ongoing.
Description:
The reinforcement projects in line with the necessary renovations for the revision of the shelter structure from the Nazi period as a residence, new roof projects on the existing building, designing the tunnel structure to be built under the foundation of the existing building and the elevator structure in the existing structure connected with the tunnel, preparing the reinforcement projects for the production of the tunnel structure , making necessary fortification calculations, reinforced concrete structural design & analysis and accordingly preparation of all civil engineering application projects for two separate buildings as additional residence and vehicle park to be built around the existing building.