Location: İzmir/Turkey
Date: July-September, 2017
Description:
Modeling of existing cooling tower, performance analysis, preparation of preliminary strengthening projects according to analysis, obtaining university approvals, preliminary budget estimate studies for strengthening, reporting all studies, preparation of comparative report for rebuild of the structure and strengthening.